The scoop on 40202

What's opening, what's being built and what the neighbors are talking about at addresses in 40202.

1,784 scoops so far.

Want scoops like this for your street? 👀
You're browsing scoops in 40202. Add your address and Nelly will email you everything happening within 1 mile of it. It's free.
Get free alerts
Odds & ends · 📍 636 E MAIN ST

A dumpster is planned at 636 E Main St in Louisville

A dumpster is in the works at 636 E Main St in Louisville. BAT Realty has it lined up for October 20 through October 27, so if you see a pod show up there, that’s the reason.

Road closures · 📍 635 W MAIN ST

Road work is coming to 635 W Main St in Louisville

Give 635 W Main Street a little room on October 16, 2026. A lane-side setup is in the works there, with 20 no-parking signs and no sidewalk, road, or curb cut closures planned. It...

Hazards · 📍 601 W BROADWAY

New smoke detectors are going in at 601 W Broadway

A new fire detection system is in the works at 601 W Broadway, and it’s for a renovation area on the 5th floor of Gene Snyder. The setup calls for smoke detectors, horns, and vi...

Road closures · 📍 101 W MAIN ST 101

Road work is planned at 101 W Main St

Give 101 W Main Street a heads-up, because road work is in the works right at 101 W Main Street in Louisville. It’s for an encroachment, with asphalt work planned for October 9 to...

Road closures · 📍 514 W LIBERTY ST

Lane and sidewalk work is planned at 514 W Liberty St

Give 514 W Liberty St a heads-up. Some road work is in the works there for October 19 through October 23, and it calls for both a lane closure and a sidewalk closure. It’s still j...

Trash & dumping · 📍 222 E WITHERSPOON ST

A dumpster is planned at 222 E Witherspoon St

A dumpster is in the works at 222 E Witherspoon St in Louisville. Quantum Enterprises Inc wants it there from October 1 through October 8, 2026. The city hasn’t signed off yet, so...

Cleanups & teardown prep · 📍 319 ABRAHAM FLEXNER WAY

Asbestos work stops in a hallway at 319 Abraham Flexner Way

A tower at 319 Abraham Flexner Way is in the middle of asbestos cleanup, and the hallway is the spot. During replacement of damaged VCT in a common hallway, PACM mastic turned u...

Road closures · 📍 620 E MARKET ST 101

Ten no-parking signs are planned at 620 E Market St 101

Give 620 E Market St 101 a little room starting October 2. Some road work is in the works there through October 13, with 10 no-parking signs planned and no road, sidewalk, or la...

Road closures · 📍 320 W JEFFERSON ST

Bagged meter parking is planned at 320 W Jefferson St

Heads-up at 320 W Jefferson St. Temporary parking on a bagged meter is in the works there, with work set for September 24 through October 1. No street cut, no road closure, and no...

Road closures · 📍 710 E JEFFERSON ST

One parking spot is blocked off at 710 E Jefferson St

A little road work is in the works at Tempo by Hilton Louisville NuLu, 710 E Jefferson St. The hotel wants to use the street out front from October 1 through October 3 for temp pa...

Odds & ends · 📍 124 S 1st ST Bldg 40202 *

A dumpster is going in at 124 S 1st St in Louisville

A dumpster is in the works at 124 S 1st St in Louisville, and it’s set to sit there from September 18, 2026 through October 15, 2026. Kentucky Spirit Bottling Co is the name on it...

Road closures · 📍 222 E WITHERSPOON ST

A curb cut is planned at 222 E Witherspoon St

A curb cut is in the works at 222 E Witherspoon St in Louisville. It’s set up as an asphalt job, with the work window running from September 25, 2026 to October 9, 2026. No road c...

Heating & cooling · 📍 201 E MAIN ST

Two mini-splits are going in at 201 E Main St

Two mini splits are on the way to 201 E Main St in Louisville, and the city has signed off on the HVAC work. Wilkinson Builders is listed on the job, with Prudential HVAC handli...

New builds & renovations · 📍 101 W MARKET ST

A future apartment buildout is planned at 101 W Market St

101 W Market is getting a tenant build-out for future apartment space. It’s planned for the 2nd through 4th floors at 101 W Market St, and the job is listed at about $5,000. The c...

Road closures · 📍 429 W MUHAMMAD ALI BLVD

A road closure is planned at 429 W Muhammad Ali Blvd

Heads-up on 429 W Muhammad Ali Blvd. Trinity Steel Services LLC has a road closure in the works there, with a start date of September 26 and a wrap date of October 3. It’s set for...

Road closures · 📍 319 E MARKET ST

Road work closes the alley by 319 E Market St

A road cut is in the works at 319 E Market St, and this one’s got a full road closure attached. Hutchins Telecom Solutions wants to dig in the alley from 121 S Floyd St to 324 E M...

Road closures · 📍 710 E JEFFERSON ST

Road work is planned at 710 E Jefferson St

Give 710 E Jefferson St a look around September 17. Tempo by Hilton Louisville NuLu is planning some street work there, and the city says 2 no-parking signs would go up for it....

Road closures · 📍 315 W BROADWAY

Bagged-meter parking is set for 315 W Broadway

Give 315 W Broadway a heads-up. Some road work is in the works there for September 15, 2026, and the plan calls for temp parking on a bagged meter. The city’s still working throug...

Road closures · 📍 200 E WASHINGTON ST

A lane closure is coming to 200 E Washington St

Give East Washington Street a little room starting September 11. Louisville Gas & Electric Company has lane closure work planned at 200 E Washington St, and it’s set to run through...

Road closures · 📍 580 S PRESTON ST

580 S PRESTON ST Encroachment Permit submitted

Heads up, expect the lane and the sidewalk to be closed at 580 S Preston St from September 14–18, 2026, and a meter will be bagged for temporary parking. Kentuckiana Electrical S...

Want scoops like this for your street? 👀
You're browsing scoops in 40202. Add your address and Nelly will email you everything happening within 1 mile of it. It's free.
Get free alerts

Other ZIP codes