101 W Witherspoon St panel install with lane and sidewalk closures
Congleton-Hacker Co. is installing perforated panels overhead at 101 W Witherspoon St, which will require lane and sidewalk closures near N First St and Bingham Way. The work — for property owner Managed Care Indemnity Inc — is scheduled during normal business hours and should take about two weeks starting 02/18/2026. Questions? Reach Will Hacker at (859) 230-7484 or Congleton-Hacker Co. at (859) 254-6481.