Lane and sidewalk work is coming to 3103 S 3RD ST
Heads up on S 3rd Street, near 3103. ITG Communications, Inc. has road work in the works there, with lane and sidewalk closures on the table, starting January 14, 2027 and running...
The closure that is about to ruin your commute.
31 scoops so far.
Heads up on S 3rd Street, near 3103. ITG Communications, Inc. has road work in the works there, with lane and sidewalk closures on the table, starting January 14, 2027 and running...
Lane work is coming to 4103 S Brook St in Louisville, with a 3-foot by 5-foot dirt cut and excavation planned. The city signed off on it, and the job is set to run from October 21...
Lane work is coming to 4608 Southern Pky in Louisville, and they’re planning a 7-foot street cut there. It’s set up as an asphalt job with excavation and a lane closure, running f...
Vero Networks is planning road work at 3840 Southern Pkwy, between Winn Ave and Oakdale Ave. They want to put in 745 feet of fiber optic cable, plus a handhole and a bore pit, wit...
A curb cut is in the works at 122 E Amherst Ave, and that usually means the sidewalk and driveway are getting a fresh setup. The city’s moving this one along, with work slated to...
Give 5601 S 3rd St a little room on October 15. Louisville Gas & Electric Company has work lined up there, with a dirt cut, excavation, a lane closure, and a sidewalk closure. It’...
400 W Kingston Ave is set for lane and sidewalk closures from November 2 through December 28, 2026. Vero Networks has the job at Jefferson County School District’s property, stret...
Give South 3rd Street a little room near 6608 S 3RD ST. Vero Networks is set to close a curb lane there while crews install 254 feet of fiber optic cable, with boring, a short open...
A new curb cut is in the works at 4806 Southside Dr in Louisville. It’s an asphalt job, and the city’s got it marked in progress now. Start date is set for September 11, 2026, wit...
Give 7202 Ivan Ct a heads-up. A dirt cut is coming there, with a lane closure and excavation on deck, and the city has signed off. Work is set to run from September 18, 2026 to Oc...
Give 4611 S 2nd St a little room starting September 11. A lane closure, street cut, and excavation are on the way there, with the city signing off for work through September 25. I...
Give Gleam Dr a little room starting September 8. Work at 806 Gleam Dr is set to bring lane and sidewalk closures, with excavation in the mix, through September 22. It’s concrete...
Fiber optic cable is headed to 4049 S 5th St, on the stretch between W Fairmont Ave and Expressway Ave. VERO Networks plans to run 1,526 feet of it along the block, with a curb l...
Give S 3rd St a miss between Alger Ave and W Kenwood Rd. Vero Networks is putting in 1,589 feet of fiber optic cable at 6209 S 3rd St, with a curb lane closure, flaggers, and a ped...
Give Royalwood Dr a little room starting September 10. A 3-by-5-foot dirt cut is going in at 7402 Royalwood Dr, with a lane closure and excavation work on the way. It’s set to run...
They're cutting a 3' x 5' dirt patch at 5444 Southview Dr, and crews will close a lane while they excavate. Louisville Gas & Electric applied for an encroachment permit that's be...
There’s nearly 2,000 feet of new fiber headed down W Kenwood Road — 1,978 feet, to be exact — with crews closing the curb lane and using flaggers between New Cut Road and South 3rd...
There's a 3' x 5' dirt cut planned right outside 7513 Yorktown Rd, and crews will be closing a lane while they dig. Louisville Gas and Electric has an encroachment permit issued...
There's going to be a curb cut at 6700 Strawberry Ln — the public works record shows an encroachment (curb cut) permit in progress for the asphalt frontage, with plan review alread...
A 3-by-5-foot dirt cut was made on Sunnys Halo Court to repair a gas leak, and the southbound curb lane between Smarty Jones Drive and the dead end was closed. Louisville Gas & E...
A curb cut is on the way at 114 Alvina Way. The city has signed off on the work, and it’s set to run from October 12, 2026 through April 12, 2027. That’s a long stretch for one dr...
Heads-up for 4201 S Brook St in Louisville. Work in the street is in the works there, with lane and sidewalk closures listed from Jan. 14 to Feb. 11, 2027. It’s set to involve dir...
A road cut is coming to 729 Gheens Ave, and it’s not a little one. The city has a 7-foot asphalt cut planned there, with excavation and a road closure in the works from October 1...
Lane work is in the works at 5100 S 3RD ST, and it’s a messy little one. Power Of Design Group LLC has plans for five street cuts, with excavation and a lane closure tossed in. Th...
A dirt cut is coming to 1218 Burnwick Ct in Louisville, and it looks like a lane closure is part of the plan. The work is set up as a 3-foot by 5-foot cut, with excavation and a s...
Give 4701 S 3rd St a heads-up, because lane and sidewalk closures are in the works there from October 18 through December 13, 2026. The stretch runs from 4701 to 4801 S 3rd St, an...
Big street-cut work is in the works at 5579 Bruce Ave, with 22 cuts planned in the asphalt and a lane closure plus sidewalk closure on the table. The job runs from October 17, 202...
Give Strawberry Ln a heads-up. Mercer Transportation has road work in the works at 6201 Strawberry Ln, and this one includes an oversized load. It’s set to run from September 16,...
Give 4716 S 6th St a heads-up, because a pavement cut is in the works there. One cut, about 4 feet by 5 feet, with lane and sidewalk closures in the mix. Work is set to run from S...
A road closure is in the works at 316 Possum Path. Hall Contracting of KY has a curb cut and asphalt work lined up there, with the city still in the early stage on it. Start date...