A dirt cut with lane and sidewalk closures is planned at 5601 S 3rd St
Give 5601 S 3rd St a little room on October 15. Louisville Gas & Electric Company has work lined up there, with a dirt cut, excavation, a lane closure, and a sidewalk closure.
Itβs set to run through November 12. So if youβre driving that stretch, expect the block to feel a little tighter than usual.