Lane and sidewalk work is starting at 806 Gleam Dr
Give Gleam Dr a little room starting September 8. Work at 806 Gleam Dr is set to bring lane and sidewalk closures, with excavation in the mix, through September 22.
Itβs concrete work, and the city has signed off on it. If you were hoping for a smooth little commute, well, not this stretch.
Itβs concrete work, and the city has signed off on it. If you were hoping for a smooth little commute, well, not this stretch.
Source: Accela Public Works