Road work is planned from 103 Pennsylvania Ave to 100 Reservoir Ave
A lane and sidewalk closure are coming to 100 Reservoir Ave, with a street cut that runs from 103 Pennsylvania Ave to 100 Reservoir Ave. Louisville Water Company has work lined u...
The closure that is about to ruin your commute.
28 scoops so far.
A lane and sidewalk closure are coming to 100 Reservoir Ave, with a street cut that runs from 103 Pennsylvania Ave to 100 Reservoir Ave. Louisville Water Company has work lined u...
Give 210 N Campbell St a look. A lane closure is in the works there for road work tied to ITG Communications, Inc., with dirt pavement listed and the job set for Jan. 14 through Fe...
Give 392 Adams a little room starting January 14, 2027. ITG Communications is lining up work there that calls for a lane closure, and the plan runs through February 11. So far, th...
Lane work is coming to 2853 Cleveland Blvd, and it’s no little poke around either. Louisville Gas and Electric is set for two dirt cuts there, each 4 by 70 feet, with a lane clos...
Give 1570 Story Ave a little room starting October 14. Louisville Gas & Electric has the green light for road work there, with two small cuts, excavation, and lane and sidewalk clo...
Give Lexington Rd near 2975 a heads-up, because a street cut is coming there. Louisville Water Company has a lane closure and a sidewalk closure planned for an asphalt cut about...
Sidewalk work is coming to 801 E Market St. The city signed off on it, and the plan calls for a sidewalk closure from September 28 through October 4. It’s set to be a short job on...
A dirt cut is coming to 313 Belvar Ave in Louisville, and it’s a lane-closure job. The city signed off on the work, which is set to run from September 28, 2026 through October 2...
Give Story Ave a heads-up. Louisville Gas & Electric Company is set for lane closure work at 1519 Story Ave, and the city signed off on it. The work is slated for September 24 thr...
A lane closure is coming to 2854 Coleen Ct. Louisville Gas & Electric is set to make a 3-foot by 5-foot dirt cut there, with excavation planned from September 21, 2026 through Octo...
Give E Main St a miss if you can. Vero Networks is set to put in 343 feet of fiber optic cable along S Wenzel St, with a curb lane closure, flaggers, and a pedestrian detour betwee...
Sidewalk closure at 1570 Story Ave is coming: crews are set to close the sidewalk from Sept. 7 through Nov. 30 under an encroachment permit. BJB Inc. is the applicant working on...
Expect a lane closure and excavation at 247 Adams St from September 8 through October 6, 2026. The city issued an encroachment permit to Louisville Gas & Electric Company; the re...
Expect a lane closure and the sidewalk taped off at 635 Edith Rd while MSD excavates the concrete, starting September 2 and running through about September 16, 2026. An encroachm...
They're cutting a 4' x 5' patch of asphalt in front of 2975 Lexington Rd starting August 30 and running through October 3. Louisville Water Company has an encroachment permit for...
They're cutting two 3'x5' patches—one dirt, one asphalt—right at 218 Thompson Ave starting Sept. 3 and expected to run through Oct. 1. Louisville Gas and Electric applied and the...
Expect a 3' x 5' dirt cut in the lane at 2717 Hillside Terrace. Louisville Gas and Electric has an encroachment permit issued for excavation with a lane closure from September 2...
Three 3'x5' asphalt cuts are planned on E Jefferson St between S Campbell St and S Wenzel St to remove a gas service. Louisville Gas and Electric applied to close the westbound c...
Sidewalk work is in the works at 1839 Frankfort Ave, by the American Printing House for the Blind. It’s slated for October 15 through October 27, with a sidewalk closure but no...
Sidewalk work is in the works at 1839 Frankfort Ave. USA Image Technologies has plans there for concrete work, with the sidewalk closed and no street closure. The city’s still proc...
Give Adams St a heads-up, because 252 Adams St has road work in the works. A lane closure is on the table there, with dirt listed as the pavement type and work slated from Janua...
Heads up for 1630 Frankfort Ave. Louisville Gas & Electric is set for sidewalk and asphalt cuts there, with lane and sidewalk closures in the mix. The work is slated for October 1...
Give 2367 Frankfort Ave a heads-up. A sidewalk closure is in the works there from November 2 through November 16, 2026, and it’s tied to road work. Arium Networks LLC has that one...
Give Frankfort Ave a heads-up near 2722. Sidewalk work is in the works there, with a closure planned from September 25, 2026 through October 9, 2026. No road closure is listed, ju...
Give 102 N Galt Ave a heads-up, there’s road work in the works there. The city’s looking at a street cut, excavation, and a lane closure at that address from September 21 throug...
A road closure is in the works at 109 N Galt Ave. Safety Services & Supply wants to do the work there from September 23 through September 30, and the plan calls for asphalt work....
A curb cut and sidewalk closure are in the works at 1626 Story Ave in Louisville. Buffalo Concrete LLC has the job lined up for the concrete work, with the stretch running from...
Give Thompson Ave a little grace near 258. A 4-by-17 street cut is in the works there, with a road closure, utility cut, and excavation planned from September 14 to September 21....