Lane and sidewalk work is starting at 1570 Story Ave
Give 1570 Story Ave a little room starting October 14. Louisville Gas & Electric has the green light for road work there, with two small cuts, excavation, and lane and sidewalk closures in the works.
The job is slated to run through November 11. Sounds like one of those projects that turns a normal stretch of street into a temporary obstacle course.
The job is slated to run through November 11. Sounds like one of those projects that turns a normal stretch of street into a temporary obstacle course.
Source: Accela Public Works