A lane closure is planned at 1038 Franklin St
Lane closures are in the works at 1038 Franklin St. Louisville Gas and Electric wants a street cut there, with a 1-foot-by-1-foot asphalt cut and excavation planned from November 4 through December 18, 2026.
Itβs still just in the works for now, but if you use that stretch of Franklin, keep an eye out.
Itβs still just in the works for now, but if you use that stretch of Franklin, keep an eye out.
The city has not published a date for when this began.
Source: Accela Public Works