A sidewalk cut and lane closure are coming to 403 Godfrey Ave
Sidewalk and asphalt cuts are coming to 403 Godfrey Ave, and the city signed off on it.
The work is set for November 2 through November 30, with one 3-foot-by-5-foot sidewalk cut and one 3-foot-by-5-foot asphalt cut.
Expect a lane closure, a sidewalk closure, excavation, and 10 no-parking signs around the spot.
The work is set for November 2 through November 30, with one 3-foot-by-5-foot sidewalk cut and one 3-foot-by-5-foot asphalt cut.
Expect a lane closure, a sidewalk closure, excavation, and 10 no-parking signs around the spot.
Source: Accela Public Works