1212 S 10TH ST applied for asbestos demolition permit
Clariant Corp is planning a demolition at 1212 S 10th St that will treat all building materials as asbestos-contaminated waste, removing friable asbestos from the entire one-story, 2,776 sq ft structure built in 1900. Abatement work will be done by ASBTECH, Inc., with Gotta Go Waste & Recycling hauling roughly 300 cubic yards in double-lined dumpsters to WM Outer Loop Landfill; the record lists a scheduled start of 12/15/2025 and outstanding fees of $2,225.74.