1343 Tile Factory Lane applied for Gas Station Stage I Operating Permit renewal
Schnell Contractors Inc. has filed a Stage I operating permit renewal for the gas station at 1343 Tile Factory Lane. The application (received 05/27/2026; permit effective 06/02/2026) lists two aboveground 500βgallon tanks β one for regular gasoline and one for diesel β with Stage I vapor controls, dualβpipe vapor balance and manual gauging; Responsible Official Michael Schnell is listed and the record is currently in progress.
Source: Accela APCD