3934 Shelbyville Rd Environmental Permit: Asbestos Abatement (PACM) for Flooring
Bluegrass Technologies Corporation will abate presumed asbestos-containing flooring and mastic at Village Cobler Shoe Repair, located at 3934 Shelbyville Rd. Filed by owner Breeland Development Corp, the work covers the 1,635 sq ft single-story former commercial space (currently vacant), is scheduled from March 27 to June 1, 2026, will use wet methods, and is expected to generate about six cubic yards of waste bound for WM Outer Loop Landfill.
Source: Accela APCD