429 W Muhammad Ali Blvd applied for asbestos abatement permit
Rudolph Hardin, LLC is lined up to perform an asbestos abatement at the Republic Building, 429 W Muhammad Ali Blvd, for owner Kentucky Promise 2017 LLC β theyβll remove windows in the elevator shaft to give masons access for masonry repairs. Scheduled from 01/15/2026 to 04/24/2026, the work covers about 84 sq ft of caulking across four window systems on the east side (floors 8β11) using wet methods, hand scrapers and HEPA vacuuming, with ACM sealed in labeled 6βmil poly, placed in a lined dumpster and hauled to a regulated landfill by Estes Waste Solutions.