The 10 most interesting neighborhood scoops from December 10, 2025
Ranked from 2 total scoops using AI
National Environmental Contracting, Inc. will remove presumed asbestos-containing pipe insulation and floor tile/mastic at GE - AP4, located at 4000 Buechel Bank Rd, for owner Haier US Appliance Solutions Inc., so others can install new flooring and insulation. The work is scheduled from 12/22/2025 to 01/31/2026 and calls for glovebagging pipe insulation and wet-method removal of about 50 sq ft of flooring/mastic, with isolation barriers, HEPA vacuums, and proper PPE. Disposal is planned at WM Outer Loop Landfill and trained supervisors will be on site; no other materials are to be disturbed.
National Environmental Contracting, Inc. will remove presumed asbestos-containing pipe insulation from the AP1 Washing Test Lab at 4000 Buechel Bank Rd for owner Haier US Appliance Solutions Inc., clearing the way for new insulation to be installed. The work is scheduled from 12/23/2025 to 01/16/2026 and will use glovebag removal with area isolation, warning signs, HEPA vacuuming, wet mopping and proper PPE; waste (about 1 cubic yard) is planned for WM - Outer Loop Landfill and no other materials are expected to be disturbed.
Sign up for Nosy Nelly and get daily or weekly updates about what's happening within a mile of your home!
Get Started — It's Free! ✨