7507 Nachand Ln HVAC replacement permit issued
Lillian Smith is replacing the full HVAC system at 7507 Nachand Ln for owners Robert Smith and Ulysses Smith, with Tom Drexler Plumbing listed as the contractor and the project estimated at $20,000. The gas-powered replacement covers one 4-ton systemโair handler/coil, condenser/heat pump and a 90% furnaceโwith equipment in the basement and the condenser at ground level; no new ductwork is planned.