A lane closure and dirt cut are planned at 2139 Duncan St
A dirt cut is coming to 2139 Duncan St, and itβs going to take a lane with it.
The city signed off on the work for Louisville Gas and Electric, with a 3-foot by 5-foot cut and excavation planned.
Work is set to run from November 16, 2026 through December 14, 2026. Keep an eye out if youβre usually rolling through there.
The city signed off on the work for Louisville Gas and Electric, with a 3-foot by 5-foot cut and excavation planned.
Work is set to run from November 16, 2026 through December 14, 2026. Keep an eye out if youβre usually rolling through there.
Source: Accela Public Works