A dirt cut and lane closure are planned at 104 Northwestern Pkwy
Give Northwestern Pkwy a little room near 104. Louisville Gas and Electric has the green light for a dirt cut there, a 3-foot by 5-foot excavation with a lane closure.
Work is slated for October 22 through November 19, with the city signed off on the whole thing. If youβre rolling through that stretch, expect the lane to be the needy one.
Work is slated for October 22 through November 19, with the city signed off on the whole thing. If youβre rolling through that stretch, expect the lane to be the needy one.
Source: Accela Public Works