A road cut and closure are planned at 2222 Greenwood Ave
Road work is in the works at 2222 Greenwood Ave in Louisville.
It’s a road cut with one 7-foot trench, a road closure, and excavation planned from October 7 through October 21, 2026.
So if you’re cutting through that stretch, give it a little extra patience.
It’s a road cut with one 7-foot trench, a road closure, and excavation planned from October 7 through October 21, 2026.
So if you’re cutting through that stretch, give it a little extra patience.
The city has not published a date for when this began.
Source: Accela Public Works