LG&E is cutting the road at 1112 Zane St
Give Zane Street a little room near 1112. Louisville Gas & Electric Company has plans for a street cut there, with a 3-foot by 25-foot asphalt cut and lane closure.
The work is set to run from November 5, 2026 through December 3, 2026. Thatβs road work on the block, and the cityβs already signed off.
The work is set to run from November 5, 2026 through December 3, 2026. Thatβs road work on the block, and the cityβs already signed off.
Source: Accela Public Works