A lane closure is planned at 5611 Ailanthus Trl
Give Ailanthus Trl a heads-up. Louisville Gas and Electric has road work lined up at 5611 Ailanthus Trl, with a dirt cut and excavation planned.
Itβs a 3-foot by 5-foot cut, and a lane closure is part of the setup. Work is slated for October 8 through November 5, so that stretch should be getting a little less roomy.
Itβs a 3-foot by 5-foot cut, and a lane closure is part of the setup. Work is slated for October 8 through November 5, so that stretch should be getting a little less roomy.
Source: Accela Public Works