A service upgrade from 200 to 400 amps is planned at 5009 Poplar Level Rd A
A bigger electrical setup is on the way at 5009 Poplar Level Rd A.
The city signed off on a rewire there, with the service going from 200 amps to 400. That’s a modest-sounding job on paper, but it’s the kind that can mean real muscle for the building.
The city signed off on a rewire there, with the service going from 200 amps to 400. That’s a modest-sounding job on paper, but it’s the kind that can mean real muscle for the building.
Source: Accela Building