A curb cut and sidewalk closure are planned at 1626 Story Ave in Louisville
A curb cut and sidewalk closure are in the works at 1626 Story Ave in Louisville.
Buffalo Concrete LLC has the job lined up for the concrete work, with the stretch running from October 12, 2026 through October 19, 2026.
No road closure is planned, so it should be a narrower kind of headache than the full-block kind.
Buffalo Concrete LLC has the job lined up for the concrete work, with the stretch running from October 12, 2026 through October 19, 2026.
No road closure is planned, so it should be a narrower kind of headache than the full-block kind.
The city has not published a date for when this began.
Source: Accela Public Works