Road work with lane and sidewalk closures is set for 1322 Garland Ave
Give Garland Ave a miss near 1322 starting September 17. Louisville Gas and Electric is set for two street cuts there, with lane and sidewalk closures and excavation in the mix.
One cut is concrete, one is asphalt, and the work is slated to run through October 30. The city signed off on it, so this oneβs official.
One cut is concrete, one is asphalt, and the work is slated to run through October 30. The city signed off on it, so this oneβs official.
Source: Accela Public Works