A lane closure and dirt cut are planned for 10912 Altsheler Pl
Give Altsheler Pl a little room starting September 15. A 3-foot by 5-foot dirt cut is going in at 10912 Altsheler Pl, with a lane closure and excavation on the books.
Work is set to run through October 13. If you live nearby, you may want to plan for a slower drive and a little extra patience.
Work is set to run through October 13. If you live nearby, you may want to plan for a slower drive and a little extra patience.
Source: Accela Public Works