ATT Southeast is doing lane work at 11700 Interchange Dr
ATT Southeast is set for road work at 11700 Interchange Dr in Louisville, and the city signed off on it on October 16, 2026.
The work calls for a lane closure, with dirt listed as the pavement type, and itβs slated to run from October 27 through November 27.
The work calls for a lane closure, with dirt listed as the pavement type, and itβs slated to run from October 27 through November 27.
Source: Accela Public Works