4527 S 1ST ST: LGE applied for dirt cut and curb lane closure to repair gas leak
Louisville Gas and Electric is planning a short repair at 4527 S 1st St to fix a gas leak, with work scheduled to begin Feb. 23, 2026 and an expected four-day work period. Theyβll close the northbound curb lane between Ottawa Ave and Mohawk Ave to perform a single 3' x 5' dirt cut; the cut will be restored under the LMPW utility restoration policy, and the property owner is listed as Timothy James Edwards.
Source: Accela Public Works