237 Flirtation Walk electrical permit final inspection completed
American Standard Electric has filed a final electrical inspection for 237 Flirtation Walk on behalf of owner Desiree Construction Co Inc. The commercial rewire (100 amps, one meter) is listed with an estimated cost of $350 and was issued after a prior permit with the roughโin wouldnโt let them call in a finalโso this looks like the paperwork move to officially close out the job.
Source: Accela Building