MADabolic Fitness is planning a storefront renovation near 500 E Main St
MADabolic Fitness is in the works near 500 E Main St in Durham. The plan is a storefront renovation for 510 E Main St, and the city is still reviewing it.
New ideas for a corner of town, from more homes to a different use for an old building. Some are still waiting on the city.
20 scoops so far.
MADabolic Fitness is in the works near 500 E Main St in Durham. The plan is a storefront renovation for 510 E Main St, and the city is still reviewing it.
Lot Lines Near 701 Ridgeway Ave In Durham Are Up For A Shuffle. The plan calls for moving the property lines between existing Lots 11 and 12 and ending up with two lots, all near...
A pair of townhome lots is in the works near 922 Lancaster St in Durham. The plan is to split that lot into two townhome-sized pieces, so this corner could be getting a whole new...
A new generator is coming to the area near 101 City Hall Plz in Durham, along with a new fenced enclosure, concrete pad, and fresh electrical hookups. The city signed off on the M...
A new wall sign is in the works near 123 Market St in Durham. Itβs a non-illuminated one for 123 Market St-Sign, with solid aluminum and vinyl details. The city is still reviewing...
More apartments are in the works near 533 21 E Main St in Durham. The project is called Commerce Street Apartments Ph 2 & Ph 3-Amendment, a phase change to the earlier plan for t...
Two small lots are in the works near 1107 B S Alston Ave in Durham. The plan is to split 1107B S Alston and add an access easement for the two pieces. No sign-off yet, so this one...
Gordon Street Townes is getting a tweak near 512 1002 Gordon St in Durham. The plan calls for changes to the phasing, new lighting spots on Jackson Street, an updated planting pla...
Three lots are in the works near 1212 Linwood Ave in Durham. Itβs the 1212 Linwood Avenue spot, and the idea is an exempt subdivision with 3 proposed lots. Nothing is signed off y...
A makeover is in the works near 902 Shepherd St in Durham. The home is slated for foundation work, new front and rear exterior doors, fresh front and rear porches, and chimney rep...
A 48-by-36-inch illuminated blade sign is coming near 119 Orange St in Durham. The cityβs signed off on it, so that little piece of streetside shine is officially in the works.
A lot split is in the works near 1017 N Buchanan Blvd in Durham. The plan for 1017 N Buchanan-3 is to divide the property the same way as PB 212, PG 282.
Two new lots are being planned near 1019 N Buchanan Blvd in Durham. The idea is to divide that spot into 2 separate parcels for development. Big changes for one corner, and the lo...
Near 1531 6 N Gregson St in Durham, a 29.65-acre tract is in the works for a split into two big lots, each topping 10 acres. Itβs the kind of move that can set up a whole new shap...
Two attached homes are in the works near 1529 Fairfax Rd in Durham. The plan would turn one existing lot of record into two house lots. No word yet on when that might move forward...
Gilbert Street is in the works near 1200 N Alston Ave, and the City of Durham wants to keep a Duke easement in place after the street closure. It would also recombine two City of...
A generator is going in near 813 Vickers Ave in Durham, and three shrubs are coming out to make room. The city signed off on the site work, so that bit is official now.
A replacement generator is in the works near 101 City Hall Plz at Durham City Hall. Thatβs the whole point of the Durham City Hall generator Replacement plan, and the city is stil...
Three townhouse lots are in the works near 923 Orient St in Durham. Thatβs the plan for the lot known as 923 Orient - Lot 7, and it would split the ground into three separate town...
Somebody wants to carve up the lot near 922 Lancaster St into three townhome lots. Itβs called 922 Lancaster St, and thatβs the shape of the plan right now. No move yet, just th...