Lane closure and digging are planned on Plantside Dr at 12900
Give Plantside Dr a miss if you can. A lane closure is in the works near 12900 Plantside Dr for a small 1-foot by 1-foot cut, with excavation planned from October 22 to December 3,...
The closure that is about to ruin your commute.
22 scoops so far.
Give Plantside Dr a miss if you can. A lane closure is in the works near 12900 Plantside Dr for a small 1-foot by 1-foot cut, with excavation planned from October 22 to December 3,...
Give 4324 Willowview Blvd a heads-up. Louisville Gas & Electric is set for a dirt cut there, a 3-foot by 5-foot dig with a lane closure and excavation in the works. Work is slated...
Give Walnut View Way a heads-up. A 3-foot by 5-foot dirt cut is coming to 11620 Walnut View Way, with a lane closure in the mix. The city signed off on it, and the work is set for...
Give Pinoak View Dr a heads-up. At 10404 Pinoak View Dr, Louisville Gas and Electric is set for a 3-foot by 5-foot dirt cut, with excavation and a lane closure in the mix. The cit...
Give 14010 Laclara Way a heads-up, there’s road work coming, and it includes a lane closure. Louisville Gas & Electric Company has a dirt cut planned there, about a 3-foot by 5-fo...
Give 13804 Stillwater Ct a heads-up. Louisville Gas and Electric is set for a dirt cut there, and the city signed off on it. It calls for a 3-foot by 5-foot cut, with a lane closu...
Give Shannon Run Trl a heads-up. Louisville Gas & Electric has the green light for dirt cuts at 3800 Shannon Run Trl, with lane closure marked yes. Work is set for October 12 thro...
A dirt cut is coming to 4306 Willowview Blvd in Louisville, and the city signed off on the road work there. It’s a 3-by-5-foot cut, with a lane closure and excavation planned from...
Lane work is coming to 4202 Hickoryview Dr, and it’s a dirt cut with a lane closure in the mix. Louisville Gas & Electric Company has the city’s sign-off for a 3-by-5-foot dig ther...
Give High Point Cir a heads-up, because Louisville Gas & Electric got the city’s sign-off for work at 8816 High Point Cir. They’re cutting into the asphalt there, one 3-foot-by-30...
Give Chenoweth Run Rd a heads-up. At 5604, Louisville Gas & Electric has the green light for road work with a lane closure and excavation, even though it says no cuts. Work is set...
Give Bakers Falls Ct a heads-up. A 7-foot asphalt street cut is planned at 11214 Bakers Falls Ct, with a lane closure in the mix and work slated from September 21 to October 5. It...
Give Plantside Dr a heads-up. Louisville Gas & Electric Company has a road work job at 13150 Plantside Dr, and it’s for two dirt cuts. The city signed off on it, and the work is s...
Give Watterson Trail near 4122 a little side-eye starting September 23. Louisville Gas & Electric got the green light for a 3-foot-by-20-foot asphalt cut near 4400 Stony Brook Dr,...
Louisville Gas & Electric Company got the green light for work near 13516 Pleasant Glen Ct. They’re planning a 3-foot by 5-foot dirt cut with excavation, and a lane closure is on...
Give 3160 S English Station Rd a heads-up. LG&E is set for lane closure and excavation work there, with a start date of September 18 and an end date of October 16. The city signed...
A 15-foot by 4-foot concrete cut is coming to 10916 Pineview Ct in Louisville. Louisville Gas and Electric has lane closure and excavation work lined up there, with the city sig...
Give Shannon Run Trl a heads-up, because some road work is in the works at 3800 Shannon Run Trl in Louisville. Louisville Gas & Electric wants a lane closure there for two dirt cu...
A 408-foot trench is in the works at 8301 Old Heady Rd, and it runs all the way toward 8101 Old Heady Rd. It’s set to take over the lane from November 2 through November 6, with...
Heads up: an encroachment permit was submitted for 3512 Stony Brook Dr for asphalt work that includes excavation and lane closures, scheduled from Sept. 14 through Dec. 25, 2026....
There's a 3' by 20' asphalt cut planned at 8601 Watterson Trail, with the road slated to be closed for excavation from Sept. 1 through Sept. 29, 2026. Louisville Gas & Electric s...
Louisville Gas & Electric Company has submitted an encroachment permit to excavate and cut the street at 8701 Avondale Ct. The project—on property owned by Kelly Co Inc—is schedule...