AT&T Southeast is boring under Tempsclair Rd at 7606 Tempsclair Rd
A 194-foot bore is coming to 7606 Tempsclair Rd, stretching over to 7610 Tempsclair Rd. ATT Southeast got the go-ahead for the work, and it includes a lane closure and excavation....
The closure that is about to ruin your commute.
9 scoops so far.
A 194-foot bore is coming to 7606 Tempsclair Rd, stretching over to 7610 Tempsclair Rd. ATT Southeast got the go-ahead for the work, and it includes a lane closure and excavation....
There's going to be soil boring in the grass strip between Shannon Dr and Rosalee Ave at 2723 Goldsmith Ln. 7NT Engineering has a permit to do geotechnical investigations in the...
Two 3' x 5' dirt cuts are coming to 8106 Thornwood Rd, with excavation and a lane closure planned from Sept. 1 to Sept. 29, 2026. Louisville Gas & Electric Company holds the issu...
Three 3' x 5' dirt cuts and excavation are planned at 3418 Rainview Cir, with a lane closure scheduled from Sept. 1 to Sept. 29, 2026. An encroachment permit is in progress, file...
Give 2942 Yorkshire Blvd a heads-up. A stretch of asphalt work is in the works there, with five street cuts planned from 2942 to 2938 Yorkshire Blvd. Itβs slated to run from Octob...
Give Radiance Rd a little patience starting September 30. At 3140 Radiance Rd, Arium Networks LLC has road work in the works, with a lane closure and a sidewalk closure on deck thr...
Give Hikes Ln a little grace starting September 30, 2026. A lane closure is in the works near 3201 Hikes Ln through October 14, and thatβs the kind of street business that makes ev...
Give Taylorsville Rd a heads-up near 3741. A lane closure is in the works there for Arium Networks LLC, with the job set to run from September 30, 2026 through October 14, 2026. S...
Heads up: Louisville Gas & Electric has an encroachment permit in progress at 2751 Summerfield Dr to excavate and do two 3' x 5' dirt cuts, so expect some digging. Theyβve planne...