A dirt cut and lane closure are planned at 9743 Mason Ln
Give Mason Ln a heads-up. At 9743 Mason Ln, Louisville Gas and Electric has the green light for a dirt cut, with one 3-by-5-foot excavation and a lane closure in the works. Work i...
The closure that is about to ruin your commute.
4 scoops so far.
Give Mason Ln a heads-up. At 9743 Mason Ln, Louisville Gas and Electric has the green light for a dirt cut, with one 3-by-5-foot excavation and a lane closure in the works. Work i...
A curb cut is in the works at 1801 Top Hill Rd in Louisville. Itβs tied to a driveway change for the property there, with the cityβs review already marked accepted and approved. T...
Give Old New Cut Rd near 6701 a heads-up. The city signed off on a dirt cut there, with a 3-by-5-foot excavation and a lane closure in the works. Work is set to run from September...
Heads up: a 3' x 5' dirt cut is planned right in the lane at 8603 Gary Way. Work runs Sept. 2β30, 2026, will involve excavation and a lane closure, and the city has issued an enc...