The 10 most interesting neighborhood scoops from December 12, 2025
Ranked from 123 total scoops using AI
Louisville Free Public Library is moving forward with asbestos abatement at the Louisville Main Library to clear the way for renovations in the 1st Floor North/South Connector Hall โ the in-progress permit covers removal of about 1,000 sq ft of floor tile and sheeting and roughly 1,000 sq ft of glue dots at 301 York St, using wet removal methods. Cardinal Industrial Insulation Company is listed as the abatement contractor (waste headed to WM Outer Loop Landfill and hauled by Gotta Go), the work is scheduled from 12/09/2025 to 04/09/2025, and because the building has individual landmark status, written UD approval is required before work proceeds.
Louisville Free Public Library is reserving bagged meters Y-301 through Y-311 on the 300 block of York Street so crews can park construction vehicles and equipment during the renovation at 301 York Street. The encroachment is scheduled from December 11, 2025, to December 1, 2026 (duration listed as 51) and is a Metro project provided at no charge โ project contact is Doug Foster at 502-574-1655. The record notes the site has individual landmark status, so written UD approval will be required before work proceeds.
National Environmental Contracting, Inc. will remove asbestos-containing floor tile, mastic and drywall/joint compound in the LAP - F3 Office & Locker Rms at 2000 Fern Valley Rd on behalf of Ford Motor Co World Headquarters to make way for manufacturing equipment upgrades. The job is scheduled for 12/26/2025โ01/09/2026, covers about 3,220 sq ft of flooring/mastic and 1,300 sq ft of joint compound, and will use wet methods, full containment with negative pressure, HEPA vacuuming, wet mopping, and proper PPE with waste hauled to WM - Outer Loop Landfill.
Sign up for Nosy Nelly and get daily or weekly updates about what's happening within a mile of your home!
Get Started โ It's Free! โจ