62 new homes are planned near 739 Baptist Rd in Durham
Falls Village North Phase 2 is in the works near 739 Baptist Rd in Durham.
The plan calls for 62 residential lots and 2 common area lots. Itβs still in corrections required territory, so this one is not a done deal yet.
The plan calls for 62 residential lots and 2 common area lots. Itβs still in corrections required territory, so this one is not a done deal yet.
The map marks the project area supplied by the city. It does not identify a specific building.
Reported status: Corrections Required