A new furnace and AC are going in at 2331 Embassy Ln
A new HVAC swap is coming to 2331 Embassy Ln, and itβs a fairly specific one.
The plan calls for a 16.5 SEER2 Carrier 2.5-ton air conditioner and an 80% two-stage variable-speed furnace, all in a single-family home.
The city signed off on it on November 10, 2026, and the work is tagged at about $9,700.
The plan calls for a 16.5 SEER2 Carrier 2.5-ton air conditioner and an 80% two-stage variable-speed furnace, all in a single-family home.
The city signed off on it on November 10, 2026, and the work is tagged at about $9,700.
Source: Accela Building