A new HVAC system is in at 10203 Deer Vista Dr 104
A new HVAC replacement is in the works at 10203 Deer Vista Dr 104, and itβs a single-system job for the place.
Somewhere around $24,552 is riding on it, with the full system already installed back in July 2025 and the final inspection now waiting to be scheduled.
The city signed off on it on November 4, 2026, so this oneβs moving through the last bit of the process.
Somewhere around $24,552 is riding on it, with the full system already installed back in July 2025 and the final inspection now waiting to be scheduled.
The city signed off on it on November 4, 2026, so this oneβs moving through the last bit of the process.
Source: Accela Building