A new AC system is going in at 2232 Payne St
A new AC system is coming to 2232 Payne St.
The city signed off on the work on October 29, 2026, and itβs a single-system replacement for the house there. Figure on an electric setup, with the air handler and coil getting swapped out.
The city signed off on the work on October 29, 2026, and itβs a single-system replacement for the house there. Figure on an electric setup, with the air handler and coil getting swapped out.
Source: Accela Building