A new HVAC system is going in at 3721 Bardstown Rd, Unit 103
A new HVAC replacement is lined up for 3721 Bardstown Rd, Unit 103.
Itβs a single system, electric, with the air handler and coil getting swapped out in the hall closet, and the job is pegged at about $6,051.14.
The city signed off on it on September 24, 2026, so this oneβs in the works.
Itβs a single system, electric, with the air handler and coil getting swapped out in the hall closet, and the job is pegged at about $6,051.14.
The city signed off on it on September 24, 2026, so this oneβs in the works.
Source: Accela Building