402 DUFF LN HVAC replacement: 2nd floor heat pump and air handler
A 1.5-ton heat pump and air handler are being added to the second floor at 402 Duff Ln.
The city issued the mechanical permit to Weber Heating & Air, active through Feb. 24, 2027, with the indoor unit in the attic and the condenser on ground level.
The city issued the mechanical permit to Weber Heating & Air, active through Feb. 24, 2027, with the indoor unit in the attic and the condenser on ground level.
The city has not published a date for when this began.
Source: Accela Building