2020 ALTA AVE HVAC residential replacement permit issued
Jimmy Scott is replacing the full gas HVAC system at 2020 Alta Ave for owner Doris Helen Presler, with work being performed by Tom Drexler Plumbing. The project is estimated at $20,727 and swaps out one 3-ton system, including a new air handler/coil and condenser/heat pump. Equipment will be installed in the basement with the condenser at ground level outside.
Source: Accela Building