10505 HOLLY BERRY DR HVAC installation permit issued
Adrian Franklin Bishop of Bishop Heating & Cooling is replacing the gas HVAC system at 10505 Holly Berry Dr. for owner Reza Mohammadi, installing two 3.5-ton systems with new ductwork and a 90% efficient furnace. The permit has been issued with an estimated project cost of $1,200, and the equipment will sit in the basement with the condenser at ground level.
Source: Accela Building