1269 S 1ST ST issued for HVAC residential alteration (2 systems)
MB3 Solution will be updating the HVAC at 1269 S 1st St for owner Family Fund LLC, performing a residential gas-system alteration that covers two separate systems. The job replaces first-floor equipment with a 3.5βton coil and condenser paired with a 92% 80k BTU furnace and installs a third-floor 2βton coil and condenser with a 92% 40k BTU furnace, with an estimated cost of $8,960.