510 Willow Stone Way HVAC system replacement permit issued
Owner Thomas Clayton P has a full HVAC system replacement planned at 510 Willow Stone Way — a gas-powered, single-family swap estimated at $17,500. Tom Drexler Plumbing is the licensed contractor for the 4-ton replacement (air handler/coil, condenser heat pump and 90% furnace), with equipment in the basement, condenser at ground level; the permit is issued through 11/20/2026 and a final inspection was requested for 11/24/2025.
Source: Accela Building