Power is being restored at 4809 Lunenburg Dr
Power’s getting restored at 4809 Lunenburg Dr in Louisville.
The city signed off on the electrical work there, a residential emergency repair for a single-family home. It’s a 200-amp setup, and an electrical final is on the calendar for November 20, 2026.
The city signed off on the electrical work there, a residential emergency repair for a single-family home. It’s a 200-amp setup, and an electrical final is on the calendar for November 20, 2026.
Source: Accela Building