A burnt-up meter base is being replaced at 2121 Baringer Ave
A burnt-up 100-amp meter base and riser at 2121 Baringer Ave got emergency attention, and the grounding was updated too.
That oneβs a single-family home, and the city signed off on the work on October 21, 2026. Allen Electric handled it, so the lights should be feeling a little less dramatic over there.
That oneβs a single-family home, and the city signed off on the work on October 21, 2026. Allen Electric handled it, so the lights should be feeling a little less dramatic over there.
Source: Accela Building