A temporary power pole is going up at 3827 Brody Ln
A temporary pole is coming to 3827 Brody Ln.
The city signed off on the electrical work there on September 28, 2026. Itβs a single-family setup, and the job is pegged at about $300.
The city signed off on the electrical work there on September 28, 2026. Itβs a single-family setup, and the job is pegged at about $300.
Source: Accela Building