A new 200 amp panel is going in at 7607 Charron Rd
A new 200 amp Siemens main panel is on the way at 7607 Charron Rd in Louisville.
The city signed off on the electrical work for the home there, and itโs set up as a rewire job for a single-family place. Thatโs a tidy little upgrade, even if the house would probably rather skip the interruption.
The city signed off on the electrical work for the home there, and itโs set up as a rewire job for a single-family place. Thatโs a tidy little upgrade, even if the house would probably rather skip the interruption.
Source: Accela Building