A temporary power pole is going up at 523 M St
A temp pole is going up at 523 M St.
The city signed off on the 100-amp setup for the single-family place there, and work is set to run through the final check on September 10, 2026.
The city signed off on the 100-amp setup for the single-family place there, and work is set to run through the final check on September 10, 2026.
Source: Accela Building