A bathroom addition is being wired at 2007 Round Ridge Rd
A bathroom addition is getting wired at 2007 Round Ridge Rd.
So the house at 2007 Round Ridge Rd is in the middle of a little electrical work, and the rough inspection is set for September 8. Not exactly the kind of project that makes the street glamorous, but it does mean somebodyβs expanding the living space.
So the house at 2007 Round Ridge Rd is in the middle of a little electrical work, and the rough inspection is set for September 8. Not exactly the kind of project that makes the street glamorous, but it does mean somebodyβs expanding the living space.