Want scoops like this for your street? 👀
You're browsing a scoop in 40216. Add your address and Nelly will email you everything happening within 1 mile of it. It's free.
Get free alerts
Electrical work

6309 Powder Horn Dr Electrical Permit Issued for 10 kWh SolarEdge Battery

Top Tier Solar Solutions is installing a 10 kWh SolarEdge Energy Bank battery onto the existing 18‑module roof‑mounted photovoltaic system for owner Shannon Johnson at 6309 Powder Horn Dr. The residential electrical permit was issued and lists the project value estimated at $12,906.96 with a 200‑amp overhead connection. It’s a handy upgrade that adds battery backup to the home’s solar setup.
Scoop date
March 12, 2026
Location
6309 POWDER HORN DR
Louisville, KY 40216

Source: Accela Building

Curious who's involved? 👀

Sign in to see the people connected to this scoop.

Sign in to unlock ✨