๐Ÿ‘€ Get notified on activity near you

Within a 1-mile radius of your address, see everything that's happening.

Other

E Chestnut Street near Norton Hospital: temporary lane closure for MRI removal

H&H Design-Build, working on behalf of Norton Healthcare (property owner Jeffrey Nickell), will close lanes and the south sidewalk on E Chestnut Street between S Brook Street and S Floyd in front of Norton Hospital to lift out the hospitalโ€™s existing MRI scanner with a crane and load it onto a truck โ€” so expect a big piece of equipment and some careful rerouting. The work is set for Saturday, July 11, 2026, from 7:00 a.m. to 2:00 p.m.; both travel lanes and the drop-off/parking lane will be blocked, the parking lane on the Jewish and Frazier Rehab side will be converted to a drive lane, parking will be prohibited during those hours, and pedestrians will be detoured to the north sidewalk.
Scoop Date
July 11, 2026
Property Address
E Chestnut Street between S Brook St and S Floyd (in front of Norton Hospital)
Louisville, KY 40202

People

H&H Systems and Design, Inc.
Applicant
H&H Systems and Design, Inc.
Applicant / Contractor
Norton Healthcare
Owner

Curious who's involved? ๐Ÿ‘€

Sign in to see the people connected to this scoop!

Sign In to Unlock โœจ